Runner vane of axial hydraulic machine, runner of axial hydraulic machine, and axial hydraulic machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10012206
SERIAL NO

14963711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A runner vane of an axial hydraulic machine according to embodiments described herein includes a center-side vane part provided on a radial center side and defined by a center-side camber line, and a boss-side vane part provided at a side edge on a side of a runner boss and defined by a boss-side camber line. As determined by the flow direction of a turbine, a curvature of an upstream side portion of the boss-side camber line is larger than a curvature of an upstream side portion of the center-side camber line. An upstream end of the boss-side vane part is positioned on a side of a rotation direction of a runner in comparison with an upstream end of the center-side vane part when viewed toward a downstream side along a rotation axis line of the runner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBAMINATO-KU TOKYO 105-8001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamaguchi, Koji Yokohama, JP 28 388
Ko, Pohan Yokohama, JP 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 3, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 3, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00