Process for the manufacturing of decorative boards

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10016786
SERIAL NO

14171617

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing a coated panel. The process can comprise providing a panel having at least an upper surface, a lower surface, and edges joining the upper surface and the lower surface. The panel can be arranged so that the lower surface is facing upwards, and first particles can be dispersed on the lower surface of the panel. The process can comprise turning the panel so that the upper surface is facing upwards, and applying first particles and second particles on the upper surface of the panel. A décor can be applied in the form of a printed pattern to the upper surface. The process can further comprise curing and/or melting the first particles to form a sealed upper surface whereby the surface forms a coating providing at least one property of abrasion resistance and scratch resistance on the surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERGO (EUROPE) AB231 25 TRELLEBORG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ericsson, Jan Helsingborg, SE 15 245
Miller, Peter Trelleborg, SE 119 3841
Quist, Magnus Trelleborg, SE 4 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00