Solid oxide high temperature electrolysis glow discharge cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10018351
SERIAL NO

14803192

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for producing steam from an electrically conductive fluid includes: (a) a glow discharge cell, (b) a fluid source, a pump or a valve, and (c) a DC electrical power supply. The glow discharge cell includes an electrically conductive cylindrical vessel having first and second ends, and at least one inlet and one outlet. A hollow electrode is aligned with a longitudinal axis of the vessel and extends at least from the first end to the second end of the vessel. First and second insulators seal the first and second ends, respectively, of the vessel around the hollow electrode and maintain a substantially equidistant gap between the vessel and the hollow electrode. A non-conductive granular material is disposed within the gap. An electric glow discharge is created whenever the cell is connected to the electrical power supply, and the electrically conductive fluid is introduced into the gap.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORET PLASMA LABS LLC3500 TANGLE BRUSH DR #110 THE WOODLANDS TX 77381

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foret, Todd The Woodlands, US 73 1908

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00