Integrated solar energy drying system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10018415
SERIAL NO

14975887

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated solar energy drying system, including: a solar greenhouse, a solar energy storage bed, an air condenser, a wet dust collector, pipes, valves, and blowers. The solar greenhouse includes: a top side, three sunny sides, a shady side, floorboards, a gas inlet, and two gas outlets. The solar energy storage bed includes: an upper air box, a lower air box, a plurality of solar heat collecting-storing pipes, and a sealing chamber. Each solar heat collecting-storing pipe includes an air pipe. The air condenser includes: an air inlet, an air outlet, two gas chambers, and a bundle of gas pipes. The solar greenhouse, the solar energy storage bed, the air condenser, the wet dust collectors are connected via pipes. The valves and the blowers are disposed on the pipes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHONGYING CHANGJIANG INTERNATIONAL NEW ENERGY INVESTMENT CO LTDEASTLAKE NEW-TECH DEVELOPMENT ZONE WUHAN HUBEI 430223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yilong Wuhan, CN 68 167
Hu, Shuchuan Wuhan, CN 8 23
Zhang, Yanfeng Wuhan, CN 177 515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00