Solar power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10024581
SERIAL NO

14777524

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar power generation system according to the present invention comprises a heat pipe arranged so as to come into close contact with an absorption module, for absorbing heat from the absorption module and directly transferring heat to a heat conversion electricity generator, and thereby has the advantages of rendering the system compact by simplifying a heat transfer structure and more effectively transferring heat by increasing contact surface area with the absorption module. Also, ample heat storage space is secured by forming the heat pipe to have a larger volume (heat capacity) than an absorption heat pipe in the absorption module so that an ample heat source can be provided by the heat conversion electricity generator, even during weather conditions when solar radiation can fluctuate suddenly, thereby allowing more stable and efficient operation of the system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF ENERGY RESEARCHDAEJEON 34129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chai, Kwan Kyo Daejeon, KR 3 1
Kang, Yong Heack Daejeon, KR 5 13
Kim, Jong Kyu Daejeon, KR 123 1558
Lee, Hyun Jin Daejeon, KR 44 255
Lee, Sang Nam Daejeon, KR 9 15
Yoon, Hwan Ki Daejeon, KR 3 13
Yu, Chang Kyun Daejeon, KR 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00