Multilevel parts from agglomerated spherical metal powder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10035190
SERIAL NO

14698230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a method for the manufacture of a multilevel metal part, the method comprising the steps of: a) compacting agglomerated spherical metal powder to a green multilevel preform such that an open porosity exists, wherein the green multilevel preform fulfills the relation zg=zHVC·a, b) debinding the green preform, c) sintering the green preform in an atmosphere comprising hydrogen d) compacting the green preform with high velocity compaction to a density of at least 95% TD, e) subjecting the part to densification to a density of at least 99 % TD. There is further provided a multilevel metal part. Advantages of the method include that it is possible to manufacture a multilevel part which is essentially uniform throughout the entire part and which has excellent tolerance, which at the same time has virtually full density and thereby having excellent mechanical properties as well as excellent corrosion properties.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METAL ADDITIVE TECHNOLOGIES78000 VERSAILLES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aslund, Christer Torshalla, SE 18 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 31, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 31, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00