Method for producing Syngas from carbon based material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10035965
SERIAL NO

15333264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

“Syngas” is produced from carbon based material in a system comprising means for feeding material into the system, means for combustion thereof, means for use of Syngas and means for extraction of combustion residues, combustion means comprise: a sealed combustion chamber; device for injection of gas into the combustion chamber; device for monitoring the quantity of gas introduced/to be introduced into the combustion chamber, where the method comprises: introducing the material into a combustion chamber, wherein the combustion chamber has a constant temperature between 300 and 600° C.; residence of the material therein for 5-13 hours; which allows combustion to decompose organic molecules of the material producing Syngas, continuously drawn off, and carbonous residues; residence of the carbonous residues at the temperature for 7-13 hours with excess air; the excess air for completely incinerating the carbonous residue; and use of the Syngas and extraction of the ash produced by the above.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HIGH TECH ENERGIE SRO93401 LEVICE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Bellis Michele Milan, IT 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 31, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 31, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00