Fastener element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10041517
APP PUB NO 20160003272A1
SERIAL NO

14763270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fastener element for transmitting a load to a machine part. One of the fastener's longitudinal extension axial ends is fixed with the machine part. The load acts onto the fastener at the other longitudinal extension axial end in a load area. The fastener comprises a plurality of longitudinally extending base parts, including the load area. The base parts are connected to each other by corrugations. To reduce shear in the fastener, a height of the corrugations is substantially constant along a first extension in a fastener longitudinal direction, extending from the machine part to a transition region. The load area is arranged along a second extension in the fastener longitudinal direction adjoining the first extension. Along the second extension, the corrugations height is reduced from the transition region, becoming zero at a final section of the fastener in the axial end region remote from the machine part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AKTIEBOLAGET SKF415 50 GÖTEBORG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schaake, Richard Utrecht, NL 11 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00