Non-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10047295
APP PUB NO 20140183024A1
SERIAL NO

13830971

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present technology is generally directed to non-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods. In some embodiments, a coking system includes a coke oven and an uptake duct in fluid communication with the coke oven. The uptake duct has an uptake flow vector of exhaust gas from the coke oven. The system also includes a common tunnel in fluid communication with the uptake duct. The common tunnel has a common flow vector and can be configured to transfer the exhaust gas to a venting system. The uptake flow vector and common flow vector can meet at a non-perpendicular interface to improve mixing between the flow vectors and reduce draft loss in the common tunnel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Chun Wai Chicago, US 45 1534
Chun, Ung-Kyung Chicago, US 8 427
Kaplarevic, Milos Chicago, US 5 211
Kapoor, Rajat Naperville, US 11 583
Quanci, John Francis Haddonfield, US 92 2799

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00