Pressurized water reactor with upper vessel section providing both pressure and flow control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10047749
APP PUB NO 20150200027A1
SERIAL NO

14665291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressurized water reactor (PWR) includes a vertical cylindrical pressure vessel having a lower portion containing a nuclear reactor core and a vessel head defining an internal pressurizer. A reactor coolant pump (RCP) mounted on the vessel head includes an impeller inside the pressure vessel, a pump motor outside the pressure vessel, and a vertical drive shaft connecting the motor and impeller. The drive shaft does not pass through the internal pressurizer. A central riser may be disposed concentrically inside the pressure vessel, and the RCP impels primary coolant downward into a downcomer annulus between the central riser and the pressure vessel. A steam generator may be disposed in the downcomer annulus and spaced apart from with the impeller by an outlet plenum. A manway may access the outlet plenum so tube plugging can be performed on the steam generator via access through the manway without removing the RCP.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BWXT MPOWER INC11525 N COMMUNITY HOUSE RD SUITE 600 CHARLOTTE NC 28277

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shargots, Scott J Forest, US 44 137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00