Method for producing a horseshoe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10052679
APP PUB NO 20180001371A1
SERIAL NO

15545086

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method for producing a horseshoe, wherein the following steps are carried out: a) at least partially viewing the hoof (16) to be shod in order to determine the required measurements for producing a shoe that fits the hoof, b) processing the measurements in order to deduce a provisional shape of the horseshoe, c) recording definitive parameters of the horseshoe, and d) producing the horseshoe on the basis of the definitive parameters. Before step b), the potential existence of at least one area of inflammation and/or at least one area of reduced blood circulation of the foot of the horse, of which the hoof is to receive the shoe, is determined by an infrared detector (17), and in step b), the existence of at least one such area is taken into account in order to determine the provisional shape and/or the structure of the horseshoe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALUE FEET SAS5 AVENUE DE GUITAYNE CANEJAN 33610

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rooryck, Maxime Canejan, FR 3 2
Rooryck, Thibaut Canejan, FR 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00