Operating machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10054119
APP PUB NO 20140186191A1
SERIAL NO

13982551

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid or battery type working machine including a hydraulic pump, an electric motor, an electric storage device, and a control device which controls a pump absorption horsepower maximum value in accordance with an amount of electricity stored in the electric storage device. The control device reduces the pump absorption horsepower maximum value by dividing the pump absorption horsepower maximum value into a plurality of regions having different target flow rates, and reduces the pump absorption horsepower maximum value from an old pump absorption horsepower maximum value corresponding to the pump absorption horsepower maximum value which has not yet been reduced to a new pump absorption horsepower maximum value corresponding to the pump absorption horsepower maximum value which has been reduced, so that temporal differences among the regions can increase in a descending order of a target flow rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTD16-1 HIGASHIUENO 2-CHOME TAITO-KU TOKYO 1100015 ?1100015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sasaki, Masataka Hitachi, JP 26 402
Satake, Hidetoshi Ishioka, JP 71 558

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00