Method for gasifying a biomass and respective gasifier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10059893
APP PUB NO 20160304797A1
SERIAL NO

15101652

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing syngas from preferably vegetal biomass is described. The method provides for the use of a fixed bed gasifier, equipped with two reactors. The biomass is fed to both reactors together with a primary flow rate of air. Advantageously, the method according to the present invention is different from the known art since a secondary flow rate of air is withdrawn from the first reactor at the area where the biomass dries, and fed to the second reactor at the area where the biomass dries, and vice versa, alternately during time. Alternatively, an oscillating air flow is created in each reactor. The achievable result is a greater syngas production, but not exclusively. The syngas quality is improved too, since the biomass has a longer time for completing the gasification reactions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TURBODEN S R L25122 BRESCIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bini, Roberto Brescia, IT 26 104
Gaia, Mario Brescia, IT 25 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00