Delay line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10069482
APP PUB NO 20170040976A1
SERIAL NO

15275018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A delay line is constructed by combining a phase generator and a fabric. The phase generator splits a digital input signal in multiple incrementally delayed versions, which are input to the fabric. The fabric has an array of node filters. Inputs of filters in the first array column are inputs of the fabric. A node filter has a delay element and a cross-coupling element, whose output signals are added or subtracted to form a filter output signal. A node filter in a row is concatenated to the previous filter in the row through its delay element. Inputs of cross-coupling elements are connected to other array rows. Outputs of node filters form the outputs of the fabric. Delay times of delay elements and cross-coupling elements are nominally equal. Drive strengths of cross-coupling elements may be lower than drive strengths of delay elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERCEPTIA IP PTY LTDUNIT 10 2B WALLARINGA AVENUE KURRABA POINT NSW 1089

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jenkins, Julian Kurraba Point, AU 57 277

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00