Resistance element and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10074467
APP PUB NO 20180197664A1
SERIAL NO

15842336

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A frequency-dependent resistance element includes an element assembly composed of a sintered magnetic material and a coil conductor embedded in the element assembly. The sintered magnetic material is composed of a primary component containing Fe, Zn, Ni, and Cu and a secondary component containing Co. In the primary component, on a percent by mole basis, the Fe content is 46.79 to 47.69, the Zn content is 12.60 to 24.84, and the Ni content is 19.21 to 32.36 in terms of Fe2O3, ZnO, and NiO, respectively. The molar ratio (Ni:Zn) of Ni to Zn is (1−X):X, where X is from about 0.28 to about 0.56. The content of Co in terms of Co3O4 is 1.0 to 10.0 parts by mass relative to 100 parts by mass of the primary component containing Fe, Zn, Ni, and Cu in terms of Fe2O3, ZnO, NiO, and CuO, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDNAGAOKAKYO-SHI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koizumi, Kazuya Nagaokakyo, JP 17 62
Sugii, Kazutoshi Nagaokakyo, JP 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00