Apparatus for manufacturing long fiber reinforced composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10081034
APP PUB NO 20180001346A1
SERIAL NO

15396892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing apparatus of a long fiber composite material according to an exemplary embodiment of the present invention includes: a main body where an inlet through which a plurality of fiber bundles are penetrated is formed at one side and an outlet through the fiber bundles are discharged is formed at the other side; a plurality of first through-hole plates that are arranged in parallel with each other along a first direction in the main body and having a plurality of through-holes through which the plurality of fiber bundles are penetrated formed therein; and a second through-hole plate that is disposed between a pair of first through-hole plates that are adjacent to each other among the plurality of first through-hole plates, and through which the plurality of fiber bundles penetrated through the first through-hole plates are penetrated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LOTTE CHEMICAL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Sung Ju Cheonan, KR 9 14
Jang, Eun Hwa Daejeon, KR 9 36
Kim, Young-Bum Daejeon, KR 229 4802
Lee, Sang Wook Asan, KR 170 1021

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00