Method for producing eutectic copper-iron alloy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10094001
APP PUB NO 20160265086A1
SERIAL NO

15036611

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for producing eutectic copper-iron alloy in which crystal grain fragments containing iron are dispersed in a copper matrix, includes: a charging step charging a first melting furnace (MF) and second MF respectively with electrolytic-copper and pure iron grain fragments; molten copper (MC) deoxidizing step heating electrolytic-copper to at least melting-point in the first MF, melting and deoxidizing the electrolytic-copper; molten iron (MI) deoxidizing step heating pure iron to at least melting-point in the second MF, melting and deoxidizing pure iron; MI transfer step increasing the MI temperature generated in the second MF; transferring the MI to a primary reaction furnace; MC transfer step increasing the MC temperature in the first MF to at least the iron melting-point; transferring the MC to the primary reaction furnace; and a reaction step causing a crystallization reaction between copper in the MC and iron in the MI in the primary reaction furnace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAKAJIMA IWAOHOKKAIDO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lai, Guoqiao Hangzhou, CN 2 10
Nakajima, Iwao Hokkaido, JP 17 90

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00