Fissionable material energy extraction system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10096387
APP PUB NO 20160099082A1
SERIAL NO

14507672

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A self-regulating inherently safe apparatus for generating neutrons is described herein that includes a reaction chamber that sustains neutron generation when filled with a liquid fissionable material and an expansion chamber that dampens neutron generation from the liquid fissionable material in response to expansion of the liquid fissionable material into the expansion chamber. Consequently, the apparatus may substantially dampen neutron generation for operating temperatures above a nominal operating temperature without requiring active or external control and inherently limit neutron generation to a maximum desired output power. Also described herein is a self-regulating system and corresponding method for extracting energy from fissionable material that includes a neutron generator that generates neutrons from a liquid fissionable material and a sub-critical collection of fissionable material that generates a non-sustaining plurality of fission events from neutrons received from the neutron generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BENNION ROBERT FWEST JORDAN UT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bennion, Robert F West Jordan, US 5 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00