Methods of fabricating a polycrystalline diamond compact

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10099346
SERIAL NO

15250363

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments relate to PDCs, methods of fabricating PDCs, and applications for such PDCs. In an embodiment, a PDC includes a substrate and a pre-sintered PCD table including an interfacial surface that is bonded to the substrate. The pre-sintered PCD table may be substantially free of leaching by-products in a region at least proximate to the interfacial surface. In an embodiment, a method of fabricating a PDC includes providing an at least partially leached PCD including an interfacial surface. The method includes removing at least some leaching by-products from the at least partially leached PCD table. After removing the at least some leaching by-products, the method includes bonding the interfacial surface of the at least partially leached PCD table to a substrate to form a PDC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
US SYNTHETIC CORPORATIONOREM UT 84058

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bertagnolli, Kenneth E Riverton, US 129 3142
Vail, Michael A Genola, US 114 4622

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00