Freight cart

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10112635
SERIAL NO

15693945

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a freight cart comprising a carriage as well as a bucket and a handle which are respectively located on front and rear sides of the carriage, the bucket is pivotally connected to the carriage, a double connecting rod assembly for driving the bucket to rotate relative to the carriage is also provided on the carriage, the double connecting rod assembly is pivotally connected to the bucket and the carriage respectively and forms a planar linkage mechanism together with the bucket and the carriage, the handle is transmissively connected to the double connecting rod assembly, and the handle is operated to make the planar linkage mechanism drivable to move the bucket relative to the carriage and switch the bucket between a storage position and a discharge position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIN XUANCONGBUILDING NO 3 NO 219 NO 219 PU ROAD YONGKANG ECONOMIC DEVELOPMENT ZONE JINHUA CITY CHINA JINHUA CITY ZHEJIANG PROVINCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Xuancong Jinhua, CN 12 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00