Space modular reactor for propulsion (SMR-P)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10124916
APP PUB NO 20180044041A1
SERIAL NO

15232595

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention serves as the fundamental design for a space-based, nuclear-powered spacecraft for deep space journeys. Nuclear energy is used as the motive power for the propulsion. The spacecraft propellant is a gas (such as helium or hydrogen), which is also the coolant for the onboard nuclear reactor. Nuclear energy is converted to thermal energy in the reactor, which heats up the propellant gas. That superheated gas then expands through the spacecraft nozzle and creates the thrust. The nuclear fuel consists of high enriched uranium. The amount of fuel is mission dependent, and requires declaration of payload, and desired speed, which is limited to sub-light for the first generation of this invention. The spacecraft will be assembled in, and launched from low earth orbit. The spacecraft final assembly consists of modular components delivered to low earth orbit from earth by conventional chemical rockets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMIRMOKRI HOMI NASROLLAHNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amirmokri, Homi Nasrollah North Potomac, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00