Modular engineered wood composite road

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10125458
APP PUB NO 20170370052A1
SERIAL NO

15535624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a modular engineered wood composite road (40) includes determining a bearing strength of the soil at a location where the modular engineered wood composite road will be installed; determining a bearing strength of the soil at a location where a modular engineered wood composite road (40) will be installed; determining a flexural strength and stiffness required for the modular engineered wood composite road (40) based on the determined bearing strength of the soil at the location where the modular engineered wood composite road (40) will be installed; assembling a plurality of engineered wood composite billets (46) from a plurality of composite wood laminations, wherein each engineered wood composite billet (46) has the required flexural strength and stiffness; and assembling the engineered wood composite billets (46) to define the modular engineered wood composite road (40).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANTHONY HARDWOOD COMPOSITES INCP O BOX 490 SHERIDAN AZ 72150

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edwards, Toby Q Bryant, US 2 47
Fiutak, Jon C Cape Elizabeth, US 5 143

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00