Structure of combustion chamber for direct injection engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10125667
APP PUB NO 20180230896A1
SERIAL NO

15513799

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel injection valve is shifted, with respect to the bore center of a cylinder, toward one end of an engine's output shaft. A top surface of a piston has inclined surfaces, and is raised by the inclined surfaces. A cavity is formed by hollowing out portions of the inclined surfaces, and faces the injection axis of the fuel injection valve. In a vertical cross section taken along the plane passing through a particular location in an intake other-side region of a combustion chamber and the location of the fuel injection valve, the distance from an injection tip of the fuel injection valve to the wall surface of the cavity at the particular location is longer than that from the injection tip to the wall surface at a diametrically opposed location to the particular location.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 501 MAZDA MOTOR CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagasawa, Takeshi Hiroshima, JP 62 350
Narahara, Kazuaki Hiroshima, JP 9 75
Nou, Yoshihisa Hiroshima, JP 19 68
Ota, Noriyuki Hiroshima, JP 35 351

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00