Seasonal heat-cold energy storage and supply pool and seasonal heat-cold energy storage and supply system comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10126019
APP PUB NO 20160102887A1
SERIAL NO

14975890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A seasonal heat-cold energy storage and supply pool, including a salt-free solar pool at the upper layer and an energy storage pool at the lower layer. The salt-free solar pool and the energy storage pool are separately connected to a water source. The salt-free solar pool includes a pool bottom and a pool wall. The pool bottom of the salt-free solar pool functions as a top cover of the energy storage pool. The energy storage pool includes a wall and a bottom which are a composite layer. The energy storage pool is provided with a heat exchange coil configured to implement heat exchange in the energy storage pool for supplying heat and cold for an external user. The salt-free solar pool and the energy storage pool are communicated through controllable valves at the pool bottom of the salt-free solar pool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHONGYING CHANGJIANG INTERNATIONAL NEW ENERGY INVESTMENT CO LTDEASTLAKE NEW-TECH DEVELOPMENT ZONE WUHAN HUBEI 430223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yilong Wuhan, CN 68 167
Hu, Shuchuan Wuhan, CN 8 23
Zhang, Yanfeng Wuhan, CN 177 515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00