Method and system for controlling a control installation of an electric motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10141871
APP PUB NO 20170244343A1
SERIAL NO

15397983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control method which is deployed in a control installation of an electric motor, the control installation including a first converter controlled for the application of the first voltage pulse edges to an electric motor of a first pulse width modulation, obtained by comparing a first carrier signal, applied at a first chopping frequency, with a first modulating signal, a second converter controlled of a second pulse width modulation, obtained by comparing a second carrier signal, applied at a second chopping frequency, with a second modulating signal. The control method involves the determination of a notional optimum phase-shift angle on the basis of the first chopping frequency and the second chopping frequency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER TOSHIBA INVERTER EUROPE SAS27120 PACY-SUR-EURE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boulharts, Hocine Triel sur Seine, FR 11 68
Messaoudi, Mehdi Vernon, FR 5 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00