Device for producing partially reduced iron

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10155997
APP PUB NO 20160304977A1
SERIAL NO

15103386

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a device for producing partially reduced iron, with which partially reduced iron having a prescribed reduction ratio can be produced efficiently. The present invention is equipped with: CO sensors that detect the carbon monoxide concentration in an exhaust gas; an O2 sensor that detects the oxygen concentration in an exhaust gas; an exhaust gas circulation device that adjusts the circulating amount of the exhaust gas supplied to a reduction furnace main body, and an air feed device that adjusts the amount of air that being fed; and a control device that controls these devices. The control devices on the basis of the carbon monoxide concentration in the exhaust gas as detected by the CO sensor and the oxygen concentration in the exhaust gas as detected by the O2 sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRIMETALS TECHNOLOGIES JAPAN LTDHIROSHIMA-SHI HIROSHIMA 733-8553

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itou, Hideki Hiroshima, JP 13 83
Kamikawa, Susumu Hiroshima, JP 24 220
Mizuki, Hideaki Hiroshima, JP 10 32
Pham, Khanhson Hiroshima, JP 6 13
Sato, Keiichi Hiroshima, JP 177 2046

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00