Method for recycling-processing of dust generated in converter furnace, and method for manufacturing steel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10155998
APP PUB NO 20170051369A1
SERIAL NO

15347645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for recycling processing of dust generated in a converter furnace, includes: crushing and drying a cake formed by adding a binder to a slurry containing iron powder-containing dust that is generated at the time of converter blowing and wet-collected to produce a mixed slurry and subjecting the produced mixed slurry to a dehydration treatment in a filter press; accumulating the cake in an accumulation tank; and charging the cake into a converter furnace 10, the crushed product in the accumulation tank 25 is kept at a temperature of less than 90° C. by forcibly passing air into the accumulation tank 25 and charged into a converter furnace according to the converter operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASTEC IRIE CO LTDFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawamura, Gouta Kitakyushu, JP 2 0
Kusakabe, Nobuo Kitakyushu, JP 4 14
Satou, Saburou Kitakyushu, JP 2 0
Takesue, Hiromichi Kyoto, JP 3 4
Yamashita, Kosuke Kitakyushu, JP 17 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00