Method for producing granules and method for producing glass product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10173917
APP PUB NO 20160332905A1
SERIAL NO

15219472

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide granules for the production of silicate glass, said granules being less likely to adhere even if heated at a high temperature exceeding 800° C. A method for producing granules, which has a step of mixing a glass raw material composition composed essentially of an alkali metal source, an alkaline earth metal source and a powdery silicon source, with water, followed by compression molding, and which is characterized in that the glass raw material composition contains at least 50 mass % of the silicon source, and at least 10 mass % in total of the alkali metal source and the alkaline earth metal source, as calculated as oxides, based on 100 mass % of the silicate glass obtainable from the granules, the alkali metal source contains an alkali metal carbonate, and D90 representing the particle size at a cumulative volume of 90% in the particle size accumulation curve of the alkaline earth metal source is at most 100 μm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGC INC5-1 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 1008405 ?1008405

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuwayama, Akiko Chiyoda-ku, JP 3 17
Maehara, Terutaka Chiyoda-ku, JP 11 52
Yamazaki, Takeshi Chiyoda-ku, JP 238 3244

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 8, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 8, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00