Two-stage biomass pyrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10174258
APP PUB NO 20170240814A1
SERIAL NO

15435990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates generally to a two-stage biomass pyrolysis processes that maximize pyrolysis vapor yield from a lignocellulosic biomass while being conducive to commercial-scale throughput of biomass. A lignocellulosic feedstock is first pyrolyzed in a reactor first stage comprising at least one auger at a temperature and residence time that produces pyrolysis vapors derived predominantly from cellulose and hemi-cellulose fractions of the feedstock. Partially-pyrolyzed feedstock from the reactor first stage is then pyrolyzed in a reactor second stage at a higher temperature for an additional residence time to produce additional pyrolysis vapors that are predominantly derived from lignin. Certain embodiments arrange multiple reactor first stages around a single reactor second stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PHILLIPS 66 COMPANYINTELLECTUAL PROPERTY - LEGAL 2331 CITYWEST BOULEVARD HOUSTON TX 77042

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dalluge, Dustin L Bartlesville, US 3 9
Gorke, Johnathan T Houston, US 11 51
Jones, Samuel T Dewey, US 16 66
Lusk, Steven E Ponca City, US 19 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 8, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 8, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00