Vehicle and electric power supply unit incorporated in vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10179512
APP PUB NO 20160250928A1
SERIAL NO

15033067

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control section is configured to perform a high-degree abnormal state control in which the control section terminates a specified shifting step for shifting a vehicle to an operable state and shifts the vehicle to an operation inhibiting state when an operation checking section determines that the vehicle is in a predetermined high-degree abnormal state, and the control section is configured to perform a low-degree abnormal state control different from a normal state control without terminating the specified shifting step, when the operation checking section determines that the vehicle is in a predetermined low-degree abnormal state different from the predetermined high-degree abnormal state, and perform the normal state control, when the operation checking section determines that the vehicle has been restored from the predetermined low-degree abnormal state to a state in which the vehicle is operable normally.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAWASAKI MOTORS LTDAKASHI-SHI HYOGO 673-8666

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuda, Yoshimoto Kobe, JP 189 1591

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00