Method of alloying reactive components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190199
APP PUB NO 20160333452A1
SERIAL NO

15155696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Metal ingots for forming single-crystal shape-memory alloys (SMAs) may be fabricated with high reliability and control by alloying thin layers of material together. In this improved method, a reactive layer (e.g., aluminum) is provided in thin flat layers between layers of other materials (e.g., copper and layers of nickel). When the stacked layers are vacuum heated in a crucible to the melting temperature of the reactive layer, it becomes reactive and chemically bonds to the other layers, and may form eutectics that, as the temperature is further increased, melt homogeneously and congruently at temperatures below the melting temperatures of copper and nickel. Oxidation and evaporation are greatly reduced compared to other methods of alloying, and loss of material from turbulence is minimized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORMCO CORPORATIONBREA CA 92821

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bachmann, Walter A Pacifica, US 5 38
Johnson, Alfred David Berkeley, US 23 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00