Process and reactor for arsenic fixation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10196707
APP PUB NO 20180105895A1
SERIAL NO

15568896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process and reactor for arsenic fixation in which a first gas stream comprises oxygen and an iron-containing particulate material. The oxygen and particulate material may be fed to reactor through respective first and second inlets. A second gas stream containing one or more volatile arsenic compounds is fed through a third inlet and mixed with the first gas stream and the particulate material to produce a combined gas stream containing the volatile arsenic compounds and the particulate material. The arsenic compounds are reacted with iron in the particulate material as the combined gas stream flows through the reactor to produce solid iron arsenates which are then recovered. The portion of the reactor including the first, second and third inlets is vertically oriented, and the reactor may include a venturi arrangement having a throat at which the second inlet is located.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HATCH LTDMISSISSAUGA ONTARIO L5K 2R7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adham, Kamal Toronto, CA 6 10
Harris, Christopher Thomas Linz, AT 2 2
Twigge-Molecey, Christopher Francis Michael Toronto, CA 2 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00