High softness, high durability bath tissue incorporating high lignin eucalyptus fiber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10196780
APP PUB NO 20170328012A1
SERIAL NO

15622098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cellulosic tissue includes cellulosic fibers that include at least one of (a) chemically pulped fibers and (b) mechanically pulped fibers. The cellulosic fibers include (i) a percentage by weight of eucalyptus fibers, and (ii) a percentage by weight of regenerated cellulosic microfibers. The cellulosic tissue further includes virgin chemically pulped fibers, with a percentage by weight of recycle fibers. The eucalyptus fibers have been prepared from eucalyptus chips by alkaline peroxide mechanical pulping, exhibiting an ISO brightness of at least 0.82×(% VCP)+0.795×(% RF)0.98+0.84×(% APMP), in which % VCP is the percentage of virgin chemical pulp in the tissue, % RF, the percentage of recycle fiber, and % alkaline peroxide mechanical pulping (APMP), the percentage of APMP eucalyptus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GPCP IP HOLDINGS LLC133 PEACHTREE STREET N E ATLANTA GA 30303

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jeffrey A Neenah, US 54 1938
Sumnicht, Daniel W Hobart, US 74 2807

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00