Apparatus for producing rapid-hardening concrete by intermixing and dissipating air in normal concrete and adding early-strength admixture thereto, and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10207233
APP PUB NO 20160332915A1
SERIAL NO

15103269

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an apparatus for producing rapid-hardening concrete and a method for producing same, the rapid-hardening concrete being produced by intermixing and dissipating air in normal concrete and adding an early-strength admixture thereto. With respect to forming rapid-hardening concrete, mixed concrete is formed by mixing in a large volume of air bubbles to be discarded, along with an early-strength admixture, to already mixed normal concrete, the early-strength admixture getting evenly dispersed therewithin by means of the ball bearing effect of the air bubbles, and when the mixed concrete is discharged, a rapid-hardening concrete is shotcreted while excess air contained in the mixed concrete is dissipated by means of high-performance air, the slump which was raised due to the large amount of air bubbles having been reduced to the slump range for normal concrete.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANGWON NATIONAL UNIVERSITY UNIVERSITY-INDUSTRY COOPERATION FOUNDATION1 GANGWONDAEHAK-GIL CHUNCHEON GANGWON-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yun, Kyong Ku Seoul, KR 6 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00