Electronic equipment and beacon

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10210720
APP PUB NO 20170345264A1
SERIAL NO

15584229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Electronic equipment includes: a substrate configured to include a first component, a second component, and an interconnection part that couples the first component with the second component by electric interconnections; and an exterior part configured to cover the first component, the second component, and the interconnection parts, and include a first exterior section that covers at least a portion of the first component, and a second exterior section that covers at least a portion of the interconnection parts, a thickness of the first exterior section being different from a thickness of the second exterior section to form a level difference in a boundary part between the first exterior section and the second exterior section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU LIMITED1-1 KAMIKODANAKA 4-CHOME NAKAHARA-KU KAWASAKI-SHI KANAGAWA 211-8588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baba, Shunji Yokohama, JP 100 980
Kanda, Takashi Kawasaki, JP 105 887
Kira, Hidehiko Nagano, JP 91 481
Matsumura, Takayoshi Yokohama, JP 72 458
Ozaki, Noritsugu Yokohama, JP 9 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00