Connecting rod with modified end

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10215167
APP PUB NO 20170122301A1
SERIAL NO

15301803

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connecting rod (24) has a modified end adapted to ensure that a lubricant film of sufficient thickness exists in an end bearing thereof when the connecting rod is placed in both tension and compression. The connecting rod includes an elongated body portion or shaft (40), a big end (42) defining a first coupling bore (44) at a first longitudinal end of the body portion (40), and a small end (46) defining a second coupling bore (48) at a second longitudinal end of the body portion (40). The small end (46) and the big end (42) each have a proximal side (50,52) nearest the shaft (40) and a distal side (54,56) furthest from the shaft (40). An opening (100) is formed in the shaft (40) adjacent the proximal side (52) for adjusting a stiffness of the proximal side (52).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOWDEN THOMASSEN COMPRESSORS BVHAVELANDSEWEG 8A RHEDEN 6990 6990

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brogle, Bernd Hoog Keppel, NL 1 2
Duineveld, Petrus Nicolaas Angerlo, NL 4 13
Langelaar, Antal Rheden, NL 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00