Electronic component fuse and fused electronic component module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10224707
APP PUB NO 20170317484A1
SERIAL NO

15497017

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, an electronic component fuse 10 includes: (1) an insulator sleeve 11 having a hollow part 11a that opens to the exterior at both ends; (2) a conductor element 12 having a fusible part 12a whose cross-section is smaller than the cross-section of the hollow part 11a, a first engagement part 12b provided at one end of the fusible part 12a, and a second engagement part 12c provided at the other end of the fusible part 12a, where the fusible part 12a is positioned in the hollow part 11a, the first engagement part 12b and the second engagement part 12c are disposed on the respective ends of the insulator sleeve 11; (3) a first terminal 13 having a first connection part 13a connected to the first engagement part 12b; and (4) a second terminal 14 having a second connection part 14a connected to the second engagement part 12c.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIYO YUDEN CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Kenji Takasaki, JP 328 4894
Nakada, Yousuke Takasaki, JP 7 20
Sato, Kazuya Takasaki, JP 158 1947
Shimura, Tetsuo Takasaki, JP 17 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00