Method for skiving machining of a workpiece for production of a chamfer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10226830
APP PUB NO 20170173713A1
SERIAL NO

15453378

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for skiving machining a toothed workpiece includes the steps of: providing the toothed workpiece rotatable about a workpiece axis; providing a toothed tool rotatable about a tool axis; tilting the tool axis through an azimuth angle φ>0° with respect to an x direction; tilting the tool axis furthermore through a polar angle Θ<90 ° with respect to a z direction; rotating the toothed tool about the tool axis, the toothed tool in a contact zone sliding over the toothed workpiece rotating about the workpiece axis. The workpiece axis defines the x direction and the perpendicular of the contact zone to the workpiece axis defines a z direction. The x direction, a y direction and the z direction form a Cartesian coordinate system. This method can easily produce a chamber on the toothed workpiece with the toothed tool which is subject to fewer geometric restrictions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FELSOMAT GMBH & CO KG75203 KÖNIGSBACH-STEIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Peschina, Jürgen Knittlingen, DE 3 3
Thijssen, Johan Bilzen, BE 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00