Conveyance apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10227183
APP PUB NO 20180155135A1
SERIAL NO

15828603

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A soldering apparatus as a conveyance apparatus includes a substrate loading portion to load a substrate on the soldering apparatus, an intermittent feeding unit to intermittently feed the substrate loaded on the soldering apparatus, a substrate discharge portion to discharge the intermittently fed substrate to the outside of the soldering apparatus and a controller to control conveyance of the substrate. The substrate loading portion includes a first conveyance path to convey the substrate, a first sensor provided in the vicinity of a substrate loading inlet of the substrate loading portion, and a second sensor arranged in a downstream side of the first sensor along the substrate conveyance direction. The intermittent feeding unit includes a second conveyance path for conveying the substrate, and a third sensor placed in the vicinity of an upstream end of the intermittent feeding unit along the substrate conveyance direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SENJU METAL INDUSTRY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Saito, Yuta Saitama, JP 150 330

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00