Method for producing metal containing composite and metal containing composite formed by adhesion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10232587
APP PUB NO 20180154608A1
SERIAL NO

15883098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An adhesive (B) of solvent containing adhesive as a suspension of low viscosity is prepared by adding a solvent MIBK to a one-part epoxy adhesive of a dicyandiamide-curable type (A). Metal shaped articles (M1 to M5) as adherends are prepared each of which, through various surface treatment, has specific surface configuration of roughened face and/or ultrafine irregularities and the surface is entirely covered with a thin layer of ceramics such as a metal oxide or metal phosphate. The specified face of each metal shaped article (M1 to M5) is painted with the solvent containing adhesive (B). The faces painted with the adhesive of two metal shaped articles (M1 to M5) are caused to abut each other, the articles are heated to cure the one-epoxy adhesive to accomplish adhesion. With one of the adherends replaced by a CFRP shaped article (P2), a composite of a metal and CFRP can be formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDOH-CORPORATION LIMITED PARTNERSHIP COMPANY401 523-7 ICHIGAO-CHO AOBA-KU YOKOHAMA-SHI KANAGAWA 225-0024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andoh, Naoki Kanagawa, JP 41 234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00