Concentric duct system for a dryer of a printing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10245853
APP PUB NO 20180244077A1
SERIAL NO

15908220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for concentric duct system for a dryer of a printing system. One embodiment includes a dryer of a printing system and a duct system. The dryer includes web conditioners sources to condition a web of print media, intake ports to supply air for the web conditioners, and outlet ports to remove air for the web conditioners. The duct system includes a supply hub and a return hub. The supply hub includes a tubular body with a lower portion and an upper portion, and supply nodes around the lower portion. The return hub includes a body around the upper portion of the supply hub, and return nodes around the body. The duct system further includes supply ducts to connect the supply nodes and the intake ports, and return ducts to connect the return nodes and the outlet ports.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RICOH COMPANY LTD3-6 NAKAMAGOME 1-CHOME OHTA-KU TOKYO 143-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boland, Stuart James Denver, US 12 24
Johnson, Scott Richard Erie, US 16 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00