Rocker arm assembly for engine braking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10247064
APP PUB NO 20170175597A1
SERIAL NO

15118498

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exhaust valve rocker arm assembly operable in a combustion engine mode and an engine braking mode can include a rocker shaft and a rocker arm. The rocker shaft can define a pressurized oil supply conduit. The rocker arm can receive the rocker shaft and is configured to rotate around the rocker shaft. The rocker arm can have an oil supply passage defined therein. A valve bridge can engage a first exhaust valve and a second exhaust valve. In the engine braking mode, pressurized oil is communicated through the pressurized oil supply conduit, through the rocker arm oil supply passage and against an actuator such that a first plunger acts on the valve bridge during rotation of the rocker arm to a first angle opening the first valve a predetermined distance while the second valve remains closed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED30 PEMBROKE RD DUBLIN 4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cecur, Majo Rivarolo Canavese, IT 56 651

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00