Harmonic current compensator and air-conditioning system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10250037
APP PUB NO 20160344185A1
SERIAL NO

15111039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A harmonic current compensator is connected in parallel with a harmonic generating load to a system power supply and supplies a compensation current Ia to limit a harmonic component contained in a load current IL to be input from the system power supply to the harmonic generating load. The harmonic current compensator includes: a load current detector that detects the load current IL; a compensation current detector that detects the supplied compensation current Ia; a control amount computing portion that computes a control amount of the compensation current Ia based on the harmonic component contained in the load current IL detected by the load current detector and the compensation current Ia detected by the compensation current detector; and a limiter that limits an upper limit of the compensation current Ia.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Akinori Tokyo, JP 39 576
Kusube, Shinsaku Tokyo, JP 42 411

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00