Apparatus for converting motion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10253854
APP PUB NO 20160195175A1
SERIAL NO

14916907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly for converting motion comprises a first arm rotatable about a first fixed pivot; a second arm rotatable about a second fixed pivot spaced apart from the first fixed pivot. A third arm pivotably connects to the second arm. A fourth arm pivotably connects to the first arm. A first connecting arm extends between the first arm and the third arm, the first connecting arm pivotably connected to the first arm and pivotably connected to the third arm. A second connecting arm extends between the first arm and the second arm, the second connecting arm pivotably connected to the first arm disposed and pivotably connected to the second arm. The third arm connects to a first position on a component to be moved relative to the first and second fixed pivots and the fourth arm connects at a second position thereon to a second position on the component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONRAD PREFAB LLC30 PRECISION DRIVE NORTH SPRINGFIELD VT 05143

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Martyn, David Bath, GB 15 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00