High efficiency power generation system and system upgrades

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10260415
APP PUB NO 20160341120A1
SERIAL NO

15225571

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system includes an inert gas power source, a thermal/electrical power converter and a power plant. The thermal/electrical power converter includes a compressor with an output coupled to an input of the inert gas power source. The power plant has an input coupled in series with an output of the thermal/electrical power converter. The thermal/electrical power converter and the power plant are configured to serially convert thermal power produced at an output of the inert gas power source into electricity. The thermal/electrical power converter includes an inert gas reservoir tank coupled to an input of the compressor via a reservoir tank control valve and to the output of the compressor via another reservoir tank control valve. The reservoir tank control valve and the another reservoir tank control valve are configured to regulate a temperature of the output of the thermal/electrical power converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HI EFF UTILITY RESCUE LLC4435 FAIRFAX AVENUE DALLAS TX 75205

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Simpkin, William Edward Dallas, US 6 46
Wilson, Donald R Arlington, US 24 524

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00