Superconductor and method of manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10262776
APP PUB NO 20160247608A1
SERIAL NO

15021502

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a superconductor and a method of manufacturing the same. The superconductor comprises: a substrate having a tape shape that extends in a first direction and having surfaces which are defined as a top surface, a bottom surface, and both side surfaces; a superconductive layer positioned on the top surface of the substrate; a first stabilizing layer disposed on the superconductive layer and containing a first metal; a protective layer disposed on the first stabilizing layer and containing a second metal which is different from the first metal; and an first alloy layer disposed between the stabilizing layer and the protective layer and containing the first and second metals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUNAM CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Kyu Han Hwaseong-si, KR 2 38
Hwang, Soon Chul Seoul, KR 2 28
Jang, Cheol Yeong Osan-si, KR 1 28
Kwon, Woong Gimpo-si, KR 59 1329
Lee, Hun Ju Yongin-si, KR 12 41
Moon, Seung Hyun Seongnam-si, KR 29 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00