Advanced flash exhaust heat recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10267511
APP PUB NO 20180031227A1
SERIAL NO

15782220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Waste heat is extracted in two stages from the exhaust (20) of a biomass dryer (14) in a grain alcohol plant (10). A boiler circuit (56) provides high pressure steam to a balance of the plant (54). A first energy recovery circuit (36) extracts heat from the exhaust via a non-contact heat exchanger (24) and provides a first relatively lower pressure steam (78) to the balance of the plant, thereby bypassing a portion of the boiler circuit. Working fluids in the boiler and first energy recovery circuits are maintained within boiler water quality specifications and are intermixed to allow the production of the first relatively lower pressure steam without a pressure reduction device. A second energy recovery circuit (44) extracts heat from the exhaust downstream of the first energy recovery circuit using a direct contact heat exchanger (38) and provides a non-boiler quality heated fluid (52) to the balance of the plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOLEAP INC6089 JOHNS ROAD SUITE 3 TAMPA FL 33634

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knight,, Jr James Tampa, US 7 41
Mitchell, Olan Wayne Cape Coral, US 7 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00