System for controlling or monitoring a vehicle system along a route

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10279823
APP PUB NO 20180037241A1
SERIAL NO

15231078

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes generating a trip plan that dictates operational settings to be implemented by a vehicle system moving along a route. The trip plan is based on a temporary work order issued for a restricted segment of the route. The work order provides a maximum speed through the restricted segment for a limited time period that is expressed using a time standard. One or more of the operational settings of the trip plan specify movement of the vehicle system through the restricted segment at a vehicle speed that is less than or equal to the maximum speed. In response to determining that the temporary work order has expired, the method includes at least one of prompting an operator of the vehicle system to confirm that the work order has expired or generating a new trip plan in which the vehicle system exceeds the maximum speed through the restricted segment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE GLOBAL SOURCING LLC901 MAIN AVENUE NORWALK CT 06851

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eldredge, David Allen Melbourne, US 27 516
Hrdlicka, Kaitlyn Ann Lawrence Park, US 3 17
Paritosh, Prakarsh Bangalore, IN 8 35
Schoonmaker, William Cherrick Melbourne, US 20 288
Sharma, Ankit Bangalore, IN 68 541
Thiyagarajan, Saravanan Bangalore, IN 10 188
Wakeman, Joseph Daniel Lawrence Park, US 10 172

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00