Crosslinked resin molded body, crosslinkable resin composition, method of producing these, silane master batch, and molded article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10287405
APP PUB NO 20180312646A1
SERIAL NO

16028290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production method, containing the step of: mixing 0.02 to 0.6 parts by mass of an organic peroxide, 0.2 to 300 parts by mass of an inorganic filler, 2 to 15.0 parts by mass of a silane coupling agent, and a silanol condensation catalyst, based on 100 parts by mass of a polyolefin-based resin, in which the inorganic filler has an X value specified by Formula (I) satisfies 5 to 1050,

description='In-line Formulae' end='lead'X=ΣA/B  Formula (I)description='In-line Formulae' end='tail'

    wherein, ΣA denotes a total amount of a product of a BET specific surface area (m2/g) of the inorganic filler and a blending amount of the inorganic filler, and B denotes a blending amount of the silane coupling agent; and a crosslinkable resin composition and a crosslinked resin molded body produced by the production method; and a silane master batch and a molded article.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumura, Arifumi Tokyo, JP 17 43
Nishiguchi, Masaki Tokyo, JP 30 276

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00