Blast furnace and method for operating a blast furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10287643
APP PUB NO 20170002433A1
SERIAL NO

15039444

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for processing metal ore includes: reducing a metal ore, particularly a metallic oxide, in a blast furnace shaft; producing furnace gas containing CO2, in the blast furnace shaft; discharging the furnace gas from the blast furnace shaft; directing at least a portion of the furnace gas directly or indirectly into a CO2-converter; and converting the CO2 contained in the furnace gas into an aerosol consisting of a carrier gas and C-particles in the CO2-converter in the presence of a stoichiometric surplus of C; directing at least a first portion of the aerosol from the CO2-converter into the blast furnace shaft; and introducing H2O into the blast furnace shaft. By virtue of the reaction C+H2O→CO2+2H, nascent hydrogen is produced in the blast furnace which causes rapid reduction of the metal ore. The speed of reduction of the metal ore is thus increased, and it is possible to increase either the throughput capacity of the blast furnace or to reduce the size of the blast furnace. An aerosol in the form of a fluid is easily introducible into the blast furnace shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CCP TECHNOLOGY GMBH81667 MÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuhl, Olaf Greifswald, DE 12 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00